Visit our Showroom!             379 N. Five Mile Road, Boise, Idaho 83713             208-685-0615             Contact Us

Exterior Concrete Coating

Take existing, boring concrete and create a brand new environment!

  1. Old concrete is first repaired if needed, abraided and thoroughly cleaned. A layer of product is troweled on.

  2. After the troweled layer is dry, the desired pattern is put down with a special stranded tape; the top coat is applied using various methods depending on the look desired.

  3. Once the design is complete the surface is sealed with a durable clear coat that protects from abrasion and UV exposure. Applications need to be re-sealed every 5-7 years to keep the surface looking new.

  4. Most applications take 2-3 days, can be walked on in 8-12 hours drying time and are usable in approximately 7 days, depending on daytime temperatures.

     
     
Copyright (c) CoverTech of Idaho 2005-2006